Building supplies are currently stored on the construction site near Warren and Moonlight. Pictured is a part of the preliminary plat showing the location of future buildings.  The orange area under construction now is site one.  The green will follow, a 15,000 sq. ft. flex space for small offices or light assembly and warehouse space.  The site (pictured) with the materials stacked on it might get a building later but not at this time. That is phase one which is two buildings.  The first is an 8,000 sq. ft. of office space for Construction Management Services Inc Mike Brock is the owner of the site. The vet office is located in the rectangle located on the eastern side of the drawing.